eprintid: 616 rev_number: 7 eprint_status: archive userid: 1 dir: disk0/00/00/06/16 datestamp: 2023-03-29 04:25:00 lastmod: 2023-03-29 04:25:00 status_changed: 2023-03-29 04:25:00 type: article metadata_visibility: show creators_name: Melliana, Melliana creators_name: Fitra, Fitra creators_name: Mesra, Trisna creators_name: lestari, Sri creators_id: E-mail: mellianna52@gmail.com NIDN 1021017201 creators_id: NIDN 1010028204 creators_id: NIDN1012067401 contributors_type: http://www.loc.gov/loc.terms/relators/AUT contributors_type: http://www.loc.gov/loc.terms/relators/AUT contributors_type: http://www.loc.gov/loc.terms/relators/AUT contributors_name: Fitra, Fitra contributors_name: Mesra, Trisna contributors_name: Lestari, Sri title: HASIL TES SIMILARITY DARI TURNITIN : Optimization of Tanker Queue at Jetty 3 and 5 in PT X Dumai ispublished: pub subjects: T1 divisions: sch_eng full_text_status: public keywords: Queue, Simulation, Software Arena abstract: PT X Dumai is a company engaged in the processing of crude oil in the earth. The oil is processed into several types such as premium, pertalite, solar and others. The distribution of the oil is done by using sea transportation or tanker. PT X Dumai has 6 jetties, where each jetty has a predetermined path. There are two jetties which always queues many ships waiting, the jetty 3 and the jetty 5. Jetty 3 and jetty 5 is a service of loading/discharge for premium oil, diesel and pertalite that commonly used by the public. Queues that occurred on jetty 3 and jetty 5 reached the jetty utilization of 90%. This is above the limit set by the utility company under 70%. Therefore, improvements using Software Arena that provides several scenarios for optimal results. Software Arena is one of the software used to simulate the queue by using multiple scenarios for troubleshooting. For the scenario 1 the result of simulation utilization is 96%. In scenarios 2 and 3 with the addition of 1 jetty on each jetty, the utilization is still at 75%. In scenario 4, additional 2 jetties the result of simulation utilization is 55%. After repairs with arena, the results obtained by adding 2 jetties again with utilization of 55%. And the service can be done by 98%. date: 2023-03-22 date_type: published publication: Optimization of Tanker Queue at Jetty 3 and 5 in PT X Dumai publisher: IOP Publishing id_number: 2044010240 refereed: TRUE referencetext: [1]Ahmad, A., Mashuri, M., 2016, Analysis of Queuing System Transports Goods in Port of Tanjung Perak Surabaya, Journal of Science and Art, Volume 5 No.1. 1st International Conference on Industrial and Manufacturing Engineering IOP Conf. Series: Materials Science and Engineering 505 (2019) 012070 IOP Publishing doi:10.1088/1757-899X/505/1/012070 9 [2]Aminulloh, AF, 2016, Queuing Model Analysis of Multi Phase (Case Study in SAMSAT Pasuruan), Final State Islamic University of Maulana Malik Ibrahim, Malang. [3]Aviva, D., 2010, Optimization Analysis dock at the Port of Samarinda With Queuing Model Approach To Anticipate Increase in Demand, EKSIS Journal, Volume 6 No. 1, ISSN 0216-6437. [4]Febriyana, R., Mahmudy, WF, 2016 Ships crossing Scheduling Using Genetic Algorithm, TIIK Journal, Volume 3 Number 1. [5]Manurung, EH, 2017, Analysis of Occupancy Jetty at PT Pertamina RU II Dumai In December 2016, Work Report Technology High School Dumai, Dumai. [6]Sentia, PD, Ilyas, Riyan, H., 2016, Simulation Approach To Queue At Service Station PT X, Industrial System Optimization Journal, Volume 15 Number 2 ISSN 2088-4842 / 2442-8795. [7]Suparti, E., Hermantoro, F., 2014, the Payment Queue Optimization System of Motor Vehicle Tax (PKB) Approach Using Simulation Software Arena (Case Study at Waterford District License Bureau), Journal of Industrial Engineering and Information Science, Volume 2 Number 2. [8]Wahyudi, GV, Sinulingga, S., Firdaus, F., 2012, Queue Simulation System Design Vehicle At filling stations Using Exponential Distribution (Case Study: Gas Station Sunset Road), JELIKU Journal, Volume 1 Number 2. [9]Winjarsih, KA, Kromordihardjo, S., 2012, Chemical Petroleum and Hydrocarbon Boost Demolition rate at Pier Unloading Vessel Queue To Alleviate Problems With Simulation Method (Case Study: PT PKG), Pomits Technical Journal, Volume 1 No. 2, ISSN 2301 -9271. citation: Melliana, Melliana and Fitra, Fitra and Mesra, Trisna and lestari, Sri (2023) HASIL TES SIMILARITY DARI TURNITIN : Optimization of Tanker Queue at Jetty 3 and 5 in PT X Dumai. Optimization of Tanker Queue at Jetty 3 and 5 in PT X Dumai. document_url: http://repository.sttdumai.ac.id/616/1/Optimization%20of%20Tanker%20Queue%20at%20Jetty%203%20and%205%20in%20PT%20X%20Dumai.pdf