eprintid: 541 rev_number: 9 eprint_status: archive userid: 1 dir: disk0/00/00/05/41 datestamp: 2022-07-01 11:29:56 lastmod: 2022-07-01 12:17:17 status_changed: 2022-07-01 11:29:56 type: thesis metadata_visibility: show creators_name: HALOMOAN, SAPUTRA creators_name: Melliana, Melliana creators_name: Fitra, Fitra creators_id: NIM. 1026201098 creators_id: NIDN 1021017201 creators_id: NIDN 1010028204 contributors_type: http://www.loc.gov/loc.terms/relators/THS contributors_type: http://www.loc.gov/loc.terms/relators/THS contributors_name: Melliana, Melliana contributors_name: Fitra, Fitra contributors_id: NIDN 1021017201 contributors_id: NIDN 1010028204 title: PREVENTIVE MAINTENANCE MOTOR LISTRIK 3 FASA DI PT NIRA MURNI KONTRUKSI ispublished: unpub subjects: TA divisions: sch_eng full_text_status: restricted keywords: eksperimen, motor listrik, taguchi abstract: Kerusakan atau tidak berfungsi salah satu motor listrik tentu mengakibatkan sistem operasi terganggu atau tidak berfungsi sama sekali yang mengakibatkan kerugian bagi perusahaan. Ditinjau dari aspek finansial, kerusakan yang tidak wajar, mengakibatkan umur ekonomis peralatan tidak tercapai atau menambah beban biaya perawatan yang tidak semestinya dikeluarkan. Pada skripsi ini, peneliti mencoba untuk menganalisis pokok-pokok permasalahan yang ada dengan mencari laju kerusakan setiap motor selama periode tahun 2012 sampai dengan tahun 2015, setelah laju kerusakan diperoleh maka langkah selanjutnya mencari setting level optimal setiap faktor yang mempengaruhi kerusakan motor listrik dengan menggunakan metode eksperimen taguchi. Faktor-faktor yang mempengaruhi sistem kerja motor listrik yaitu suhu kerja motor, power input, supply power dan beban motor, sedangkan melalui hasil eksperimen taguchi yang dilakukan diperoleh hasil setting level optimal bahwa suhu kerja yang baik 400c, power input optimal 380 volt, power input optimal 3 fasa dan beban kerja yang optimal 75 amper. date: 2015-11-16 date_type: completed institution: Sekolah Tinggi Teknologi Dumai department: Teknik Industri thesis_type: other thesis_name: other referencetext: Ansori, Nacnul dan Mustajib, Imron 2013. Sistem perawatan terpadu. Yogyakarta Graha ilmu Asisco, H., 2012,Usulan Perencanaan Perawatan Mesin Degan Metode Reliability Centered Maintenance(RCM), Teknik industri, Universitas Islam Negeri Sunan Kalijaga,Yogyakarta Barnes. 1980 “Motion and Time Study Design and Measurement of Work”, Seventh Edition, John Wiley and Sons Inc, New York. Haryono 2001, Desain Eksperimen Untuk Peningkatan Mutu (Quality Engineering), Taguchi Method Indrojarwo, Baroto. 2010.’’Development Of Indonesia New Batik Design By Exploration And Exploitation Of Recent Context” Jurnal Penelitian Desain Produk Industri FTSP ITS Linawati 2005,Preventive Maintenance System Dengan Modularity Design Sebagai Solusi Penurunan Biaya Maintainance, Fakultas Teknologi Industri, Universitas Kristen Petra, Luthfianto, S., Siswanto, Farid, A., Penerapan Setting Level Optimal Menggunakan Metode Taguchi Pada Produksi Batik Tulis, ISSN 1693- 6590 Volume 12 Nomor 2. Nachnul, 2004 ,Sistem Perawatan Terpadu, Graha Ilmu Radita 2004 , Penggunaan Dan Pengaturan Motor Listrik, Graha Ilmu, Ross, Philip J.1996. Taguchi Tecnique Fot Quality Engineering Second Edition. Mc Graw Hill Book Company Inc.Singapore Sodikin, I.,2010,Analisis Penentuan Waktu Perawatan Dan Jumlah Persediaan Sukucadan Rantai Garu Yang Optimum, Fakultas Teknologi Industri , Yogyakarta Soejanto, I.,2009, Desain Eksperimen Dengan Metode Taguchi, graha ilmu,Yogyakarta Tarigan, P., Ginting, E., dan Siregar, I., (2013),Perawatan Mesin Secara Preventive Maintenance Degan Modularity Design, Universitas Sumatra Utara, Medan Taguchi, Genichi, (1989), “Quality Engineering In Production Systems”, McGraw-Hill Book Company, Singapore Wahyu Haumahu, P., (2011), Optimalisasi Produk Degan Menggunakan Metode Perancangan Toleransi Taguchi, Program Studi Statistika,Universitas Diponogoro Semarang citation: HALOMOAN, SAPUTRA and Melliana, Melliana and Fitra, Fitra (2015) PREVENTIVE MAINTENANCE MOTOR LISTRIK 3 FASA DI PT NIRA MURNI KONTRUKSI. Other thesis, Sekolah Tinggi Teknologi Dumai. document_url: http://repository.sttdumai.ac.id/541/1/BAB%201%20AWAL.docx document_url: http://repository.sttdumai.ac.id/541/2/DAFTAR%20PUSTAKA.docx