eprintid: 212 rev_number: 9 eprint_status: archive userid: 1 dir: disk0/00/00/02/12 datestamp: 2020-08-03 06:36:26 lastmod: 2020-08-03 06:36:26 status_changed: 2020-08-03 06:36:26 type: thesis metadata_visibility: show creators_name: RAMADAN, FEBRI creators_name: Indrawan, Surya creators_name: Febrina, Wetri creators_id: NIM. 1426201073 creators_id: NIDN 1003108802 creators_id: NIDN1014027801 contributors_type: http://www.loc.gov/loc.terms/relators/THS contributors_type: http://www.loc.gov/loc.terms/relators/THS contributors_name: Indrawan, Surya contributors_name: Febrina, Wetri contributors_id: NIDN 1003108802 contributors_id: NIDN1014027801 title: PERENCANAAN PERAWATAN SISTEM MESIN BOILER MACKENZIE DENGAN METODE REALIBILITY CENTERED MAINTENANCE DI PT MERIDAN SEJATI SURYA PLANTATION ispublished: unpub subjects: T1 subjects: TA divisions: sch_eng full_text_status: restricted keywords: Boiler Mackenzie, Reliability Centered Maintenance, dan Total Minimum Downtime abstract: Boiler adalah bejana tertutup dimana panas pembakaran dialirkan ke air sampai terbentuk air panas atau steam. Kerusakan yang terjadi pada boiler mengakibatkan downtime terlalu lama sehingga proses produksi terganggu. Diperlukan pemeliharaan pada sistem mesin boiler mackenzie pada PT Meridan Sejati Surya Plantation. Berdasarkan dari permasalahan tersebut penulis menggunakan metode reliability centered maintenance dengan menggunakan failure mode effect analisys, logic tree analisys, dan task selection. Perencanaan metode realibility centered maintenance (RCM) untuk perawatan mesin boiler Mackenzie adalah dengan melakukan pemilihan sistem dan pengumpulan informasi, mendefinisikan batasan sistem, mendeskripsikan sistem dan functional diagram block, penentuan fungsi sistem dan kegagalan fungsi, failure mode and effect analysis (FMEA), logic tree analysis (LTA), dan yang terakhir Menentukan pemilihan tindakan (task selection), sedangkan perawatan boiler Mackenzie dengan condition directed (CD) mencapai 82.8% , Time directed (TD) mencapai 13.8%, Failure finding (FF) mencapai 3.4%, dengan melakukan perhitungan total minimum downtime waktu pergantian komponen kritis yang didapat untuk komponen rantai 91 hari dan kopling 90 hari. date: 2019-02-07 date_type: completed pages: 4 institution: Sekolah Tinggi Teknologi Dumai department: Teknik Industri thesis_type: other thesis_name: other referencetext: Asisco, H., Amar, K., dan Perdana, R, Y., 2012, Usulan Perencanaan Perawatan Perawatan Mesin Dengan Metode Reliability Centered Maintenance (RCM) Di PT Perkebunan Nusantara VII (Persero) Unit Usaha Sungai Niru Kab Muara Enim, Kaunia Vol. VIII, No 2, oktober 2012: 78-79 Aufar, N, A., Leksananto, K., Prassetiyo , H., 2014, usulan kebijakan perawatan area produksi trim chassis dengan menggunakan metode reliability centered maintenance (studi kasus PT Nissan Motor Indonesia), Reka Integra ISSN: 2338-5081 Jurusan Teknik Industri Itenas | No.04| Vol.02 Jurnal Online Institut Teknologi Nasional Oktober 2014 Azis, M, T., Suprawhardana, M, S., dan Purwanto, T, P., 2009, Penerapan Metode Reliability Centered Maintenance (RCM) Berbasis WEB pada Sistem Pendingin Primer di Reaktor Serbaguna GA. Siwabessy, ISSN 1978-0176 Corder, Anthony., 1992, Teknik Manajemen Pemeliharaan, ter, K, Hadi., Jakarta, Erlangga Hakim, L., dan Fahrizal., 2012, Penerapan RCM Pada Sistem Distribusi Air di PDAM Pasir Putih Pematangan Barangan Kabupaten Rokan Hulu, Universitas Pasir Pangaraian Jainuri, 2013, Perencanaan Perawatan Mesin Boiler Dengan Pendekatan Reliability Centered Maintenance (RCM) Pada PT Bumi Pratama Khatulistiwa, Teknik Industri, Universitas Tanjungpura, Kalimantan Barat Jono., 2015, Total Produktive Maintenance (TPM) Pada Perawatan Mesin Boiler Menggunakan Metode Overall Equipment Effectiveness (OEE) Kromodihardjo, S., Bhakti, R., 2015, Perancangan Sistem Pemeliharaan Menggunakan Metode Reliability Centered Maintenance (RCM) Pada Pulverizer, Studi Kasus: PLTU Paiton Unit 3, Jurnal Teknik Its Vol. 6, No. 1, (2015) ISSN : 2337-3539 Kurniawan, F., 2013., Manajemen Perawatan Industri, Graha Ilmu, Jakarta Mauidzoh, U., Zabidi, Y., & Prasetya, D. M. 2017, Perawatan Mesin Kompresor Udara dengan Metode Reliability Centered Maintenance. Prosiding SNTI dan SATELIT 2017 (pp. C150-157). Malang: Jurusan Teknik Industri Universitas Brawijaya Rahman, H., Garside, K, A., dan Kholik, M, H., 2017, Usulan Perawatan Sistem Boiler dengan Metode Reliability Centered Maintenance (RCM), Jurnal Teknik Industri, Vol. 18, No. 01, Februari 2017, pp. 86-93 Waroy, A, M., Budiarto, U., dan Kiryanto., 2016, Analisa Perawatan Berbasis Keandalan Pada Fuel Oil System Km. Bukit Siguntang Dengan Metode Reliability Centered Maintenance (RCM), Jurnal Teknik Perkapalan - Vol. 4, No.1 Januari 2016 citation: RAMADAN, FEBRI and Indrawan, Surya and Febrina, Wetri (2019) PERENCANAAN PERAWATAN SISTEM MESIN BOILER MACKENZIE DENGAN METODE REALIBILITY CENTERED MAINTENANCE DI PT MERIDAN SEJATI SURYA PLANTATION. Other thesis, Sekolah Tinggi Teknologi Dumai. document_url: http://repository.sttdumai.ac.id/212/1/BAB%201.docx document_url: http://repository.sttdumai.ac.id/212/2/daftar%20pustaka.docx